Skip to main content

Rivalz

Rivalz introduces an AI Intelligence Layer that powers an ecosystem of modular AI applications.

Built on a DePIN (Decentralized Physical Infrastructure Network) framework, Rivalz utilizes Dymension with Celestia and Eigen to operate a RollApp. The AI DePIN layer consists of Light rClients and Validator zNodes. While rClients contribute storage from their devices, zNodes serve as validators, tracking data flows within the DePIN layer and flagging any malicious rNode activity.

Prerequisites​

  • zNode license (NFT)
  • EVM-compatible wallet
  • Sufficient funds or credits for your Node subscription

Run your Rivalz Nodes with NodeOps Console​

Use the video or walkthrough to understand how to set up and deploy your Nodes.

Step 1: Connect with the Console​

  1. From the Console, sign up or log in using the Log In button; bottom left of the Console.
Show me
Log in or sign up to the NodeOps Node as a Service DePIN Compute layer no code dashboard using the log in button
  1. Choose your sign in method:
  • Wallet/Email/Social
Show me sign in methods

Use the tabs to learn more:

To sign in with an EVM-compatible wallet, you must approve the connection request in your Wallet. Click Connect and Confirm the request.

Show me
Approve connection request with EVM EVM-compatible wallet such as MetaMask to connect to the NodeOps Node as a Service DePIN Compute layer no code dashboard

Step 2: Select your Protocol and Node​

  1. Navigate to Node Deployment on the left side menu and select Rivalz.

  2. Update the Quantity to determine how many Nodes to deploy.

Step 3: Set up your Node subscription​

The "zNode" option should be selected by default. Click "Connect Wallet" to link the wallet that holds your zNode NFT. Once connected, click "Fetch NFT," and the system will automatically display the number of NFTs associated with your wallet.

  1. Select your subscription duration Choose your subscription length. Longer subscriptions reduce the monthly cost. If you have NodePoints or a discount code, you can redeem them at this stage. After making your selections, click "Continue to Pay" to proceed.

  2. Complete payment.

Learn more about payment options.

Step 4: Delegate Node​

  1. After completing the payment, you'll be redirected to Nodefolio. The newly deployed Node will be marked with an "Action Required" status. Click "Click to Delegate" to begin the delegation process.
  1. Complete the delegation:

A pop-up window will display your wallet address and associated NFTs. Click "Click to Delegate" again to confirm and complete the transaction in your wallet. Since the transaction occurs on the Arbitrum Blockchain, a small gas fee may apply. Once successful, you'll see a transaction hash as confirmation.

Step 5: (Optional) Verify your deployment​

Congratulations! Your Rivalz zNode is now fully set up. Visit Nodefolio to verify the status, which should change from "Click to Delegate" to "Running".

FAQ​

  • What's the subscription cost?
Duration (Months)1–10 Keys $ (per m) cost11–50 Keys $ (per m) cost51–100 Keys $ (per m) cost100+ Keys $ (per m) cost200+ Keys $ (per m) cost500+ Keys $ (per m) cost1000+ Keys $ (per m) cost
1(3.75) 3.75(4.69) 4.69(5.63) 5.63(7.50) 7.50(9.38) 9.38(18.75) 18.75(37.50) 37.50
3(3.56) 10.69(4.45) 13.36(5.34) 16.03(7.13) 21.38(8.91) 26.72(17.81) 53.44(35.63) 106.88
6(3.38) 20.25(4.22) 25.31(5.06) 30.38(6.75) 40.50(8.44) 50.63(16.88) 101.25(33.75) 202.50
12(3.00) 36.00(3.75) 45.00(4.50) 54.00(6.00) 72.00(7.50) 90.00(15.00) 180.00(30.00) 360.00
  • Which network are they going live on?

Arbitrum

  • Do I need to upgrade my Node/s on my own?

No, NodeOps automates deployments and upgrades.

Show me accepted stables and tokens

You can convert $NODE to credits, convert other supported stables or tokens to credits, or pay with supported cards or tokens:

Our payment partner, Copperx accepts stables and tokens across multiple chains

Source.

What next?​